Simulations and Measurements of X-Band Accelerating Structures of The CLIC Project

Authors/Creators

  • 1. Izmir Inst Tech

Contributors

  • 1. Izmir Inst Tech
  • 2. ROR icon European Organization for Nuclear Research

Description

The Compact Linear Collider (CLIC) Project is 50 km long e−, e+ linear collider planned to be built in three stages with 3 TeV center-of-mass energy at its last stage. The CLIC accelerator includes around 140000 accelerating structures. The cost optimisation process is ongoing before the production stage. In order to obtain the CLIC design requirements, the accelerating structures are machined out of OFE copper and ultra precision turning and milling with single diamond tool. The required precision on the order of the micron makes the final product relatively expensive. The assembly of these copper parts is done by electron beam welding of two halves or diffusion bonding of disc stacks. In this thesis we investigate the potential geometrical correlation between the imperfection of the accelerating structure discs inner radii and their individual frequency deviations before and after bonding. Following the results of this work, the tolerance study of the machining and bonding effects will be understood and manufacturing process will be optimised for cost saving.

Files

CERN-THESIS-2018-121.pdf

Files (29.1 MB)

Name Size Download all
md5:cd44f5ede1dc2cebf0cbb61979326b12
29.1 MB Preview Download

Additional details

Additional titles

Translated title
CLIC projesi x-bant hizlandirici yapilari için simülasyonlar ve ölçümler

Identifiers

CDS
2634994
CDS Report Number
CERN-THESIS-2018-121

CERN

Department
BE - Beams Department
Programme
No program participation
Accelerator
Not applicable
Experiment
Not applicable
Studies
CLIC

Linked records